The following projects would be completed at the Bayfield & LaPointe Schools with the bond funding:
Bayfield School: ($4.1 million)
- Address Failing Building Systems
- Roof Replacement over the cafeteria, lobby, and classrooms completing a school-wide roofing update over the past seven years
- Heating & Ventilation System Upgrade in the “2000 addition,” replacing the original 25-year-old system and completing the school’s five-year HVAC improvement plan
- Automatic Fire Sprinkler System installed throughout the entire school
|
Bayfield School |
|
 |
Roof over the 2000 addition leaks into hallways and classrooms |
|
|
 |
HVAC system is outdated and is the last of the five-year improvement plan. |
|
|
 |
There is not currently a fire sprinkler system in the school. |
|
|
|
|
|
LaPointe School: ($3.6 million)
Resolve Safety & ADA Compliance Issues Create safe and secure entrances with an ADA-accessible ramp to classrooms Update building-wide accessibility, HVAC, electrical, and fire suppression systems to meet compliance Renovate aging classrooms, gym, and resource areas to better support teaching and learning needs
|
La Pointe School |
|
 |
Classrooms are outdated and in need of removal of hazardous materials and finishes. |
|
|
 |
HVAC system is intended for residential use and does not meet school needs. |
|
|
 |
The school does not meet building codes for accessibility for primary rooms and entrances. |
|
|
 |
Bathrooms do not meet building codes for accessibility. |
|
|
 |
The gym has original finishes and needs to be replaced and re-freshed. |
|
|
|
|
|
|
|